Saturday 27 February 2010

Animating the curtains, work in progress 1 week to go.



my work on the curtains is going slow this saturday.

This is a quick render of what i have been doing for the curtains and as you can see the animation looks very mechanical and not at all like cloth.

As you can probably imagine this is pretty challenging. Maya has crashed on me around 3 times and i have had to start over on one side now and then. I'm still optimistic despite these set backs.

I am aiming to have all the animating done for the group on monday, tuesday at the latest. We really must pull everything together. this is lighting, texture mapping animation, sound, title sequence, compositing. All needs to be on schedule for the rendering. i can imagine the rendering will take time and we have been working very hard to bring everything together.

I am happy with the work despite it constantly knocking me down and picking me up. I aim to have all sides of the bed curtains finished with hand animation. the curtains will be finished as a dynamic. It takes a long time to get a cache file with the dynamics because the scene is over a minute in length. So seeing quick feedback is a luxury at the moment.

I am pretty confident this weekend i will see the animation brought to a decent result. this weekend will just be animating, don't have any other plans. I will resume with steve Crocker's project as soon as animating for the group is completed.

want to have them both done to a decent level, and if i stay focused, and without the worry of written submissions on my back right now I am pretty confident i can do this.

No comments:

Post a Comment